Skip to content
ZA NetworkGet started
Public tender · eTendersState-owned companyKwaZulu-NatalTender no. TPL/2026/08/0578/10542/RFP

Engineering, procurement and construction of the Howick pump station fire system upgrade

Transnet SOC Ltd

Closes

In 13 days

Friday, 11 December 2026 at 16:00 SAST

Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.

Add to calendar:GoogleApple or Outlook

Can you bid?

Confirmed for this tender:

CIDB grade 4 or higher · Reserved for QSEs · Compulsory briefing (already held)

Next step

Read the requirements below, then check the official documents before you commit time.

Check against your business, free

Not recently confirmed. 23 official documents. Missing from the listing: estimated value.

In short

What they want
Engineering, procurement and construction of the Howick pump station fire system upgrade
What must be delivered
The content in this section outlines the various aspects that shall require the demolition or removal of the existing fire protection system. The demolition/removal process is described in two phases, however below it is detailed with intermediate steps, in accordance with the compliance requirements stated in section 8. At all times during the fire system upgrade, a fire protection system must be fully functional. During the installation of the new equipment, temporary connections need to be tied into the existing system. The demolition and installation process of the respective equipment can be described as follows: 1.From Annexure B.4 Fire Engineering Documents.pdf, page 21. Read the full scope in the documents.
How much and how long
12 months
Delivery address
Old Main Road, Howick, Howick, 3290
Who can bid
CIDB grade 4 or higher · Set aside for QSE businesses · Attended the compulsory briefing
How it's scored
  • You need at least 60% on functionality (quality) before price counts
  • Specific goals: Women ownership, Black ownership

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Engineering, Construction
Briefing session
Compulsory, 23 Oct 2026, 10:00Old Main Road, Howick, KZN (approximate GPS co-ordinates 29°28'37.19"S, 30°11'41.05"E)
CIDB grading
Grade 4 or higher
Functionality threshold
60%
Type
Request for proposal (RFP)
Delivery location
Old Main Road, Howick, Howick, 3290
Published
15 Oct 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Set-aside (EME, QSE), Functionality threshold, Compulsory briefing
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
SBD forms (Standard Bidding Documents)
National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
Set-aside (EME, QSE) (Reserved for businesses of a size)
An EME (exempted micro enterprise) has a yearly turnover of R10 million or less; a QSE (qualifying small enterprise) between R10 million and R50 million. A tender set aside for them accepts only businesses of that size as the main bidder, shown by a sworn affidavit.
Functionality threshold (The minimum quality score)
Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
Compulsory briefing (A compulsory site meeting or clarification session)
A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Check it against your business

Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.

No account needed. Your answers stay in this page's link and aren't stored.

Confirmed for this tender

  • CIDB grade 4 or higherRead from official document

    The tender asks for this grading or higher.

    Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf · page 15: “…ownership, in line with the code of good practice, together with the tender; 3. A valid CIDB certificate in the correct designated grading;(Mandatory) 4. Proof of registration on the Central Supplier Database; 5. Letter of Good Standing with the Workmen's compensation fund by the tendering…”

  • Reserved for QSEsRead from official document

    Only these business sizes may bid as the main contractor.

    Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf · page 90: “…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black-owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTIC's website at…”

  • Compulsory briefing (already held)Stated in listing

    Bidders who don't attend are disqualified.

    Source: the official listing

  • At least 60% on functionalityRead from official document

    Bids below the threshold aren't scored on price.

    Source: Addendum No. 1 Howick Annexures incl..pdf · page 95: “…in a score of 0 being awarded for that particular criterion • Failure to achieve a minimum score of 60 points (out of 100) will result in disqualification Functionality criteria Sub-criteria Sub-criteria points Maximum number of points T2.2-04 Management and CV's Project Manager 3 15 Construction Manager 3…”

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Where and how to submit

Submit electronically (online)

Must arrive before Friday, 11 December 2026 at 16:00 SAST. Late bids are never accepted.

“…: 12 weeks from closing date Note to the bidders: Bidders are required to ensure that electronic bid submissions are done at least a day before the closing date to prevent issues which they may encounter due to their internet speed, bandwidth or the size of the number of uploads they are submitting. Transnet will not be held liable for any challenges experienced by…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 1)

  • Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
  • We found the method but not the address in the text we read: check the quoted page of the tender document.

ZA Network never submits bids for you. The tender documents are the final word on where and how.

Before you submit

Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified

  1. Sign every SBD form

    Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.

  2. Tax compliance status valid on the closing date

    Check it on SARS eFiling before 11 Dec 2026. A status that lapses before closing can cost you the award.

  3. CSD profile compliant, details matching

    Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.

  4. Proof for every point you claim

    Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.

  5. Briefing attendance certificate

    Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified.

  6. CIDB grade 4 or higher

    Active on the CIDB register on the closing date, or through a joint venture that meets the grade.

  7. Proof you're an QSE

    This tender is reserved. Include the affidavit or certificate that shows your business size.

  8. Reach 60% on functionality

    Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.

  9. The buyer's pricing schedule, complete

    Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.

  10. Every returnable schedule

    List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.

  11. Submit a day early

    Late bids aren't considered, even by a minute. Aim to submit by 10 Dec 2026, and check the address or upload method twice.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 23 of 23 documents, 24 Nov 2026, 20:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 4 or higher

“…ownership, in line with the code of good practice, together with the tender; 3. A valid CIDB certificate in the correct designated grading;(Mandatory) 4. Proof of registration on the Central Supplier Database; 5. Letter of Good Standing with the Workmen's compensation fund by the tendering…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 15)

Functionality threshold

Minimum 60% to be evaluated on price

“…in a score of 0 being awarded for that particular criterion • Failure to achieve a minimum score of 60 points (out of 100) will result in disqualification Functionality criteria Sub-criteria Sub-criteria points Maximum number of points T2.2-04 Management and CV's Project Manager 3 15 Construction Manager 3…” (Addendum No. 1 Howick Annexures incl..pdf, page 95)

Reserved for

QSEs only

“…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black-owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTIC's website at…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 90)

Subcontracting required

At least 25% of the contract

“…Good Practice. 4.5 A person will not be awarded points for B-BBEE status level if it is indicated in the bid documents that such a bidder intends sub-contracting more than 25% of the value of the contract to any other enterprise that does not qualify for at least the points that such a bidder qualifies for, unless the intended sub-contractor is an EME that has the capability and…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 90)

Briefing

Briefing session on 23 October 2026 (the document doesn't say whether it's compulsory)

“…FOR PROPOSAL SUBMISSION 1. Minutes of Briefing session held on 23 October 2026. Refer (Annexure 1) 2. Amended Contract Data specifically Part one - Data provided by the Employer Core Clause 84.1 level of PI confirmed; secondary Option X5 & X7 Sectional Completion and delay…” (Addendum No. 1 Howick Annexures incl..pdf, page 2)

Specific goals

Women ownership, Black ownership

“…scorecard will be accept) as per DTIC guidelines 30% Black Women Owned Entities B-BBEE Certificate / Sworn- Affidavit / B-BBEE CIPC Certificate (in…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 20)

How to submit

Electronically (online)

“…: 12 weeks from closing date Note to the bidders: Bidders are required to ensure that electronic bid submissions are done at least a day before the closing date to prevent issues which they may encounter due to their internet speed, bandwidth or the size of the number of uploads they are submitting. Transnet will not be held liable for any challenges experienced by…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 1)

Contract period

12 months

“…to a contract, or an order issued in terms of a Framework Agreement that has a duration of 12 months or more, and: a) a contract of R5 million or more, in the case of a Professional Service or Service Contract or an order issued in terms of…” (TPL Howick Tender Documents Consolidated 15-10-2026.pdf, page 123)

Documents the pack mentions
  • CSD registration report (TPL Howick Tender Documents Consolidated, p. 11)
  • Tax compliance status (SARS PIN) (TPL Howick Tender Documents Consolidated, p. 6)
  • B-BBEE certificate or sworn affidavit (TPL Howick Tender Documents Consolidated, p. 15)
  • CIDB registration certificate (TPL Howick Tender Documents Consolidated, p. 13)
  • COIDA letter of good standing (TPL Howick Tender Documents Consolidated, p. 15)
  • Company registration documents (CIPC) (TPL Howick Tender Documents Consolidated, p. 20)
  • Proof of briefing attendance (TPL Howick Tender Documents Consolidated, p. 14)
  • Joint venture or consortium agreement (TPL Howick Tender Documents Consolidated, p. 13)
  • Audited financial statements (TPL Howick Tender Documents Consolidated, p. 10)
  • Reference letters from previous clients (TPL Howick Tender Documents Consolidated, p. 52)
  • Professional registration (ECSA, SACQSP, SACPCMP or similar) (TPL Howick Tender Documents Consolidated, p. 13)
  • Public liability insurance (TPL Howick Tender Documents Consolidated, p. 152)
Disqualification rules
  • “Tenderers failing to attend the compulsory tender clarification meeting will be disqualified” (TPL Howick Tender Documents Consolidated, p. 8)
  • “Failure to achieve the 60-point threshold will lead to disqualification” (TPL Howick Tender Documents Consolidated, p. 17)
  • “Respondents are to note that changes to its submission will not be considered after the closing date” (Addendum No. 1 Howick Annexures incl..p, p. 73)
  • “CIRBED SERVICE • Failure to provide supporting documentation to support an assertion will result in a score of 0 being awarded for that particular criterion • Failure to achieve a minimum score of 60 points (out of 100) will result in disqualification Funct…” (Addendum No. 1 Howick Annexures incl..p, p. 95)
  • “The use of existing pipeline markers will not be considered as sufficient indication of the route of a pipeline” (Annexure B.5 Electrical Engineering Docu, p. 161)
  • “Where manuals include drawings that still need to be revised to "As-Built" status, and such manuals are required prior to 'As-Built' status, the manual will not be considered to be in its final form until the "As-Built" version of each such drawing has been…” (Annexure B.2 Document Management and Pla, p. 66)
  • “Unless documentation has been registered by Document Control it will not be considered as official” (Annexure B.2 Document Management and Pla, p. 299)
  • “Offers will not be considered unless full particulars and sufficient literature is provided at the tendering stage to enable Transnet Pipelines to assess each offer properly” (Annexure B.4 Fire Engineering Documents., p. 37)
  • “The replenishment rate of fire water will not be considered during the calculation of firefighting water capacity required” (Annexure B.4 Fire Engineering Documents., p. 127)
  • “A forced mechanical ventilation system to meet the ventilation requirements for the fire pump will not be considered, unless the Contractor is able to provide the electrical power supply requirements from the pump-set or ECP” (Annexure B.4 Fire Engineering Documents., p. 236)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

Changes to this tender

  1. New or amended document · noticed 24 Nov 2026

    New document published: Addendum No. 2 Howick.pdf

  2. New or amended document · noticed 24 Nov 2026

    New document published: Addendum No. 3 Howick annexures incl..pdf

  3. Closing date changed · noticed 24 Nov 2026

    20 Nov 2026, 16:00 → 11 Dec 2026, 16:00

  4. New or amended document · noticed 31 Oct 2026

    New document published: Addendum No. 1 Howick Annexures incl..pdf

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

General guidance

Not part of this listing: what usually applies to South African public tenders.

Need money to deliver this? Tender and contract finance

Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.

Tender and contract financeHow to fund a contractGrants and programmes

If you win: payment terms, and the cash to carry

Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.

Description

From the official listing.

ENGINEERING, PROCUREMENT AND CONSTRUCTION OF THE HOWICK PUMP STATION FIRE SYSTEM UPGRADE

Contact person

Rory Torr

rory.torr@transnet.net

031-816-9770

About this data

Source
National Treasury eTenders
Freshness
Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 10:28 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-174251
On eTenders
Open the eTenders tender list and search for TPL/2026/08/0578/10542/RFP. The official record is also available as raw data.
Missing from the listing
  • Estimated value: eTenders rarely publishes a value. We never estimate one.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

The competition

24 past awards by this buyer.

See who won

Winners, repeat suppliers and their sizes are shown to signed-in accounts. Create a free account to see them.

Similar open tenders

  1. State-owned companyTender (request for bid)Gauteng

    The provision of professional engineering services for the assessment, design, procurement support, construction-stage services and close-out of the…

    Airports Company of South Africa Limited

    Closes 03 Dec 2026, 12:00

    • Engineering
    • Professional services
    • +1 more
    • Functionality 70%