- What they want
- Request for proposal (rfp) for refurbishment and upgrade of electrical systems at megawatt park.
- What must be delivered
- C3 ECC3 COVER PAGE compliant electrical systems. The project will refurbish and upgrade the medium-voltage switchgear, battery tripping units, transformers, low-voltage switchgear, selected power cables and standby diesel generator systems while ensuring minimal disruption to the existing electrical supply. The purpose of the Works is to provide a complete engineering, procurement, construction, testing and commissioning solution for the replacement and integration of these critical electrical assets.From MWP_Electrical System upgrade_NEC_Final.pdf, page 43. Read the full scope in the documents.
- How much and how long
- 3 years
- Delivery address
- 1 Maxwell Dr, Sunninghill, Sandton, 2157
- Who can bid
- CIDB grade 7EP or higher · Set aside for EME and QSE businesses
- How it's scored
- You need at least 70% on functionality (quality) before price counts
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Electrical
- Briefing session
- Optionalhttps://teams.microsoft.com/meet/3392614846127052?p=ILi5gpdUMRJmFrc6WM
- CIDB grading
- Grade 7EP or higher
- Functionality threshold
- 70%
- Type
- Request for proposal (RFP)
- Delivery location
- 1 Maxwell Dr, Sunninghill, Sandton, 2157
- Published
- 19 Nov 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Set-aside (EME, QSE), Functionality threshold
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
- Set-aside (EME, QSE) (Reserved for businesses of a size)
- An EME (exempted micro enterprise) has a yearly turnover of R10 million or less; a QSE (qualifying small enterprise) between R10 million and R50 million. A tender set aside for them accepts only businesses of that size as the main bidder, shown by a sworn affidavit.
- Functionality threshold (The minimum quality score)
- Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 7EP or higherRead from official document
The tender asks for this grading or higher.
Source: Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf · page 10: “…CIDB Requirements (where applicable for Engineering and Construction Works Contracts) CIDB Requirements are applicable, only a grading of 7EP or higher will be accepted. 2.29 Contract Skills Development Goals (CSDG) is Not applicable. 2.30 Contract Participation Goals is Not…”
Reserved for EME and QSEsRead from official document
Only these business sizes may bid as the main contractor.
Source: SDLI Stratgey Refurbishment and Upgrade of Electrical Systems at Megawatt Park.pdf · page 3: “…requirement for this? If Yes, what is the minimum percentage? Sub-contracting can only be concluded with one or more of the following entities: • An EME or QSE which is at least 51% owned by black people; • An EME or QSE which is at least 51% owned by black people who are youth; • An EME or QSE…”
At least 70% on functionalityRead from official document
Bids below the threshold aren't scored on price.
Source: Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf · page 8: “…are applicable. The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Functionality 100% Threshold 70% Refer to the Technical Evaluation Criteria folder.”
Not confirmed
Tender documents reviewed: 27 / 28 relevant documentsNot confirmed
1 document still needs review: Appendic A6.1 _ List of LV Boards _ 240-56356465 Rev 2.xls (a format we can't read). Requirements in it aren't confirmed.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Thursday, 10 December 2026 at 10:00 SAST. Late bids are never accepted.
“…to the following address by the stipulated closing date and time Tenders are to be submitted electronically via the Eskom e-Tendering system using the following link: https://etendering.eskom.co.za Please note: • All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 1)
- Submit online: etendering.eskom.co.za
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for E3865EGDMWP
- Ask Martin Nndwammbi: nndwamtm@eskom.co.za
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 10 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
CIDB grade 7EP or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
Proof you're an EME or QSE
This tender is reserved. Include the affidavit or certificate that shows your business size.
Reach 70% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 09 Dec 2026, and check the address or upload method twice.
Official documents
- pdfMWP_Electrical System upgrade_NEC_Final.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxMWP-ELECTRICAL REFURBISHMENT-ACTIVITY SCHEDULE R.3.xlsxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docxMWP_Electrical System upgrade_NEC_Final.docxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRequest for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSDLI Stratgey Refurbishment and Upgrade of Electrical Systems at Megawatt Park.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf20261110_Cat2- Quality Req _MWP Refurbishment of Electrical Systems .pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf20261110_ Form A Cat2_ MWP Refurbishment of Electrical Systems .pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docx240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docx240-109253698 Contract Quality Plan (CQP) Template.docxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf20260824_GFD_ERE_MWP_Electrical Systems SHE Specification_Rev01.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsx20260828_GFD_ERE_MWP_Electrical Systems Project Occupational Health and Safety Risk Assessment_Rev01.xlsxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf20260825_GFD_ERE_MWP_Electrical Supply Project_SHE Tender Evaluation.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfMWP Replacament of main Electrical Systems Technical Evaluation Strategy Report Rev 1 Final.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAppendix C1 _ Phase 1 _ MWP_Preliminary Short_Circuit _ Summary.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAppendix B _ Phase 1 _ MWP_Preliminary Load_Flow Report.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAppendix A13 _ Compliance Schedule.xlsxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docxAppendix A8.1 _ Diesel Generators preliminary sizing schedule AB _ Block A and B.docxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docxAppendix A5_ Transformers - Technical Schedule AB Rev 1.docxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAppendix A1.1 _ MWP MV Exiting Single Line Drawing 0.50-2001 11kV Phase 1 and 2 to be updated.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf363-ERE-CBBZ18-PN0017-59 MWP Refurbishment Project Electrical Requirements _ Rev 3.2 Final.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfScope of Work-Replacement of MV Incomer Cables (003) Signed.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAppendix A2 and A3_ 11kV MWP SWITCHGEAR SCHEDULE REV 3.1.xlsxFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf230311-E-E-200-E_rev0_(Generator Plant - Fuel Line Layout).pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsAppendic A6.1 _ List of LV Boards _ 240-56356465 Rev 2.xlsFrom eTenders, 19 Nov 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfMWP_Electrical System upgrade_NEC_23 Nov 2026 Rev2.pdfFrom eTenders, 25 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docxMWP_Electrical System upgrade_NEC_23 Nov 2026 Rev2.docxFrom eTenders, 25 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 27 of 28 documents (1 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 25 Nov 2026, 16:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 7EP or higher
“…CIDB Requirements (where applicable for Engineering and Construction Works Contracts) CIDB Requirements are applicable, only a grading of 7EP or higher will be accepted. 2.29 Contract Skills Development Goals (CSDG) is Not applicable. 2.30 Contract Participation Goals is Not…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 10)
- Functionality threshold
Minimum 70% to be evaluated on price
“…are applicable. The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Functionality 100% Threshold 70% Refer to the Technical Evaluation Criteria folder.” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 8)
- Reserved for
EME and QSEs only
“…requirement for this? If Yes, what is the minimum percentage? Sub-contracting can only be concluded with one or more of the following entities: • An EME or QSE which is at least 51% owned by black people; • An EME or QSE which is at least 51% owned by black people who are youth; • An EME or QSE…” (SDLI Stratgey Refurbishment and Upgrade of Electrical Systems at Megawatt Park.pdf, page 3)
- Subcontracting required
At least 51% of the contract, to designated group
“…sub-contractor 7.7 Which designated group does the sub-contractor belong to: - a) An EME or QSE; b) An EME or QSE which is at least 51% owned by black people; c) An EME or QSE which is at least 51% owned by black people who are youth; d) An EME or QSE which is at least 51% owned by…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 28)
- How to submit
Electronically (online)
“…to the following address by the stipulated closing date and time Tenders are to be submitted electronically via the Eskom e-Tendering system using the following link: https://etendering.eskom.co.za Please note: • All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 1)
- Bid validity
90 days after closing
“…2026 Closing date and time 10 December 2026 at 10h00 (South African Standard Time) Tender validity period 90 days from the closing date and time Clarification meeting Non-compulsory clarification meeting will be held. Date: 27 November 2026 Time: 10h00…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 1)
- Contract period
12 months
“…for guidelines on this). 1. Application of CPA • CPA conditions may apply if the contractual duration is to be longer than 12 months. • If the contractual duration will be less than or equal to 12 months, a fixed priced offer must be submitted. • For contracts with a…” (Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf, page 35)
- Documents the pack mentions
- CSD registration report (Request for Proposal (RFP)_Refurbishment, p. 9)
- Tax compliance status (SARS PIN) (Request for Proposal (RFP)_Refurbishment, p. 13)
- B-BBEE certificate or sworn affidavit (Request for Proposal (RFP)_Refurbishment, p. 11)
- CIDB registration certificate (Request for Proposal (RFP)_Refurbishment, p. 26)
- COIDA letter of good standing (Request for Proposal (RFP)_Refurbishment, p. 15)
- Company registration documents (CIPC) (Request for Proposal (RFP)_Refurbishment, p. 26)
- Proof of briefing attendance (Request for Proposal (RFP)_Refurbishment, p. 16)
- Joint venture or consortium agreement (Request for Proposal (RFP)_Refurbishment, p. 6)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (Request for Proposal (RFP)_Refurbishment, p. 14)
- Reference letters from previous clients (MWP Replacament of main Electrical Syste, p. 11)
- Disqualification rules
- “Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated” (Request for Proposal (RFP)_Refurbishment, p. 7)
- “consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Clause Number from Standard Conditions of Tender Tender Data Tenderers who do not meet the threshold for functionality scoring will be disqualified 3” (Request for Proposal (RFP)_Refurbishment, p. 9)
- “If not fully completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (Request for Proposal (RFP)_Refurbishment, p. 11)
- “If the returnable is not fully completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (Request for Proposal (RFP)_Refurbishment, p. 11)
- “A [tender/proposal] will be disqualified if the tenderer/s, or any of its directors have: 1” (Request for Proposal (RFP)_Refurbishment, p. 31)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 25 Nov 2026
New document published: MWP_Electrical System upgrade_NEC_23 Nov 2026 Rev2.docx
New or amended document · noticed 25 Nov 2026
New document published: MWP_Electrical System upgrade_NEC_23 Nov 2026 Rev2.pdf
New or amended document · noticed 19 Nov 2026
New document published: 20261110_ Form A Cat2_ MWP Refurbishment of Electrical Systems .pdf
New or amended document · noticed 19 Nov 2026
New document published: Appendix A1.1 _ MWP MV Exiting Single Line Drawing 0.50-2001 11kV Phase 1 and 2 to be updated.pdf
New or amended document · noticed 19 Nov 2026
New document published: MWP Replacament of main Electrical Systems Technical Evaluation Strategy Report Rev 1 Final.pdf
New or amended document · noticed 19 Nov 2026
New document published: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
New or amended document · noticed 19 Nov 2026
New document published: Appendix A5_ Transformers - Technical Schedule AB Rev 1.docx
New or amended document · noticed 19 Nov 2026
New document published: 230311-E-E-200-E_rev0_(Generator Plant - Fuel Line Layout).pdf
New or amended document · noticed 19 Nov 2026
New document published: 20260828_GFD_ERE_MWP_Electrical Systems Project Occupational Health and Safety Risk Assessment_Rev01.xlsx
New or amended document · noticed 19 Nov 2026
New document published: Request for Proposal (RFP)_Refurbishment and Upgrade of Electrical Systems at Megawatt Park E3865EGDMWP (003).pdf
New or amended document · noticed 19 Nov 2026
New document published: 20260825_GFD_ERE_MWP_Electrical Supply Project_SHE Tender Evaluation.pdf
New or amended document · noticed 19 Nov 2026
New document published: Appendix A2 and A3_ 11kV MWP SWITCHGEAR SCHEDULE REV 3.1.xlsx
New or amended document · noticed 19 Nov 2026
New document published: Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf
New or amended document · noticed 19 Nov 2026
New document published: Appendix A8.1 _ Diesel Generators preliminary sizing schedule AB _ Block A and B.docx
New or amended document · noticed 19 Nov 2026
New document published: 20261110_Cat2- Quality Req _MWP Refurbishment of Electrical Systems .pdf
New or amended document · noticed 19 Nov 2026
New document published: MWP-ELECTRICAL REFURBISHMENT-ACTIVITY SCHEDULE R.3.xlsx
New or amended document · noticed 19 Nov 2026
New document published: Appendix A13 _ Compliance Schedule.xlsx
New or amended document · noticed 19 Nov 2026
New document published: 20260824_GFD_ERE_MWP_Electrical Systems SHE Specification_Rev01.pdf
New or amended document · noticed 19 Nov 2026
New document published: MWP_Electrical System upgrade_NEC_Final.docx
New or amended document · noticed 19 Nov 2026
New document published: Appendix B _ Phase 1 _ MWP_Preliminary Load_Flow Report.pdf
New or amended document · noticed 19 Nov 2026
New document published: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
New or amended document · noticed 19 Nov 2026
New document published: Appendic A6.1 _ List of LV Boards _ 240-56356465 Rev 2.xls
New or amended document · noticed 19 Nov 2026
New document published: 240-109253698 Contract Quality Plan (CQP) Template.docx
New or amended document · noticed 19 Nov 2026
New document published: Appendix C1 _ Phase 1 _ MWP_Preliminary Short_Circuit _ Summary.pdf
New or amended document · noticed 19 Nov 2026
New document published: SDLI Stratgey Refurbishment and Upgrade of Electrical Systems at Megawatt Park.pdf
New or amended document · noticed 19 Nov 2026
New document published: Scope of Work-Replacement of MV Incomer Cables (003) Signed.pdf
New or amended document · noticed 19 Nov 2026
New document published: 363-ERE-CBBZ18-PN0017-59 MWP Refurbishment Project Electrical Requirements _ Rev 3.2 Final.pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
Price the buyer's schedule
The pricing schedule lists 5 items (Appendix A2 and A3_ 11kV MWP SWITCHGEAR SCHEDULE REV 3.1.xlsx › LIST OF MV SWITCHGEARS). We've copied the items and quantities into the bid price calculator: add your prices to see the total, VAT and the lowest you can go.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
REQUEST FOR PROPOSAL (RFP) FOR REFURBISHMENT AND UPGRADE OF ELECTRICAL SYSTEMS AT MEGAWATT PARK.
Contact person
Martin Nndwammbi
About this data
- Source
- National Treasury eTenders
- Freshness
- Last checked 27 Nov 2026, 02:37. The official source last confirmed this listing 27 Nov 2026, 02:37. Check the official page for late changes.Last confirmed by eTenders on 27 Nov 2026, 02:37 (SAST). This page was generated on 28 Nov 2026, 10:40 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-178818
- On eTenders
- Open the eTenders tender list and search for E3865EGDMWP. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.