Closes
In 12 days
Thursday, 10 December 2026 at 10:00 SAST
Add to calendar:Google (closing)Google (briefing)Apple or Outlook
Can you bid?
Confirmed for this tender:
CIDB grade 7 or higher
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeLast checked 27 Nov 2026, 02:37. 2 official documents. Missing from the listing: estimated value.
In short
- What they want
- Small Hydro and Eskom Zimbane Office Fire Protection System
- What must be delivered
- PAGE 39 OF 58 C3.1 EMPLOYER'S SERVICE INFORMATION • For extinguishers tested with their top caps on, tighten the cap slowly while the water supply remains open. When all the entrapped air within the cylinder has been bled off and after water emerges, tighten the cap fully. • For extinguishers tested with a test closure or fitting, tighten the bonnet or fitting fully while the water supply remains open. When all the entrapped air within the cylinder has been bled off and after water emerges, close the vent tightly. • Apply pressure at an even rate of pressure rise until the test pressure is reached. Maintain this pressure for at least 60 s.From Attachment.zip, page 39. Read the full scope in the documents.
- How much and how long
- 12 months
- Delivery address
- Eskom Small Hydros and Eskom Zimbane Office, Eastern Cape
- Who can bid
- CIDB grade 7 or higher
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Professional services
- Briefing session
- Optional, 30 Nov 2026, 11:00Microsoft Teams
- CIDB grading
- Grade 7 or higher
- Functionality threshold
- Not stated in the listing. The tender document decides.
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- Eskom Small Hydros and Eskom Zimbane Office, Eastern Cape
- Published
- 19 Nov 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 7 or higherRead from official document
The tender asks for this grading or higher.
Source: Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf · page 12: “…service or service contract or an order issued in terms of such a contract; or b) a cidb grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract].…”
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Thursday, 10 December 2026 at 10:00 SAST. Late bids are never accepted.
“…Meeting ID: 388 404 042 651 960 6 Passcode: AB2zY65g Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time NOTE TO ALL TENDERERS: PLEASE KEEP CHECKING THE TENDER BULLETIN FOR…” (Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf, page 1)
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for E3847GXPOU
- Ask Le-Anne Moses: moseslb@eskom.co.za
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
- We found the method but not the address in the text we read: check the quoted page of the tender document.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 10 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
CIDB grade 7 or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 09 Dec 2026, and check the address or upload method twice.
Official documents
Read from the official documents
What the tender documents say
Read by rules from 2 of 2 documents, 19 Nov 2026, 13:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 7 or higher
“…service or service contract or an order issued in terms of such a contract; or b) a cidb grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract].…” (Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf, page 12)
- Subcontracting required
At least 51% of the contract, to designated group
“…sub-contractor 7.7 Which designated group does the sub-contractor belong to: - a) An EME or QSE; b) An EME or QSE which is at least 51% owned by black people; c) An EME or QSE which is at least 51% owned by black people who are youth; d) An EME or QSE which is at least 51% owned by…” (Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf, page 28)
- How to submit
Electronically (online)
“…Meeting ID: 388 404 042 651 960 6 Passcode: AB2zY65g Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time NOTE TO ALL TENDERERS: PLEASE KEEP CHECKING THE TENDER BULLETIN FOR…” (Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf, page 1)
- Contract period
12 months
“…applicable to a contract or an order issued in terms of a framework agreement that has a duration of 12 months or more, and to: a) contract of R5 million or more, in the case of a professional service or service contract or an order issued in terms…” (Invitation to Tender (ITT) Rev. 28 - Small Hydro and Eskom Zimbane Office.pdf, page 12)
- Documents the pack mentions
- CSD registration report (Invitation to Tender (ITT) Rev. 28 - Sma, p. 10)
- Tax compliance status (SARS PIN) (Invitation to Tender (ITT) Rev. 28 - Sma, p. 16)
- B-BBEE certificate or sworn affidavit (Invitation to Tender (ITT) Rev. 28 - Sma, p. 13)
- CIDB registration certificate (Invitation to Tender (ITT) Rev. 28 - Sma, p. 26)
- COIDA letter of good standing (Invitation to Tender (ITT) Rev. 28 - Sma, p. 18)
- Company registration documents (CIPC) (Invitation to Tender (ITT) Rev. 28 - Sma, p. 26)
- Joint venture or consortium agreement (Invitation to Tender (ITT) Rev. 28 - Sma, p. 5)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (Invitation to Tender (ITT) Rev. 28 - Sma, p. 17)
- Proof of briefing attendance (Attachment.zip › Attachment 17 - High Ri, p. 23)
- Disqualification rules
- “Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated” (Invitation to Tender (ITT) Rev. 28 - Sma, p. 7)
- “Functionality requirements Functionality requirements are applicable refer to Attachment 3 Tenderers who do not meet the 80% threshold for Technical evaluation scoring will not be evaluated further” (Invitation to Tender (ITT) Rev. 28 - Sma, p. 8)
- “If not completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (Invitation to Tender (ITT) Rev. 28 - Sma, p. 14)
- “If the returnable is not completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (Invitation to Tender (ITT) Rev. 28 - Sma, p. 14)
- “A [tender/proposal] will be disqualified if the tenderer/s, or any of its directors have: 1” (Invitation to Tender (ITT) Rev. 28 - Sma, p. 31)
- “Tenderers that Eskom finds to be ineligible will be disqualified” (Attachment.zip › Attachment 11 - Eskom -, p. 2)
- “Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified” (Attachment.zip › Attachment 11 - Eskom -, p. 2)
- “If an original tender is not submitted at all, or a copy of the original tender is not submitted at all, the tenderer will be disqualified” (Attachment.zip › Attachment 11 - Eskom -, p. 3)
- “Failure to attend a clarification meeting or site visit that is identified as compulsory will result in disqualification from participation” (Attachment.zip › Attachment 11 - Eskom -, p. 4)
- “the tender will be disqualified” (Attachment.zip › Attachment 11 - Eskom -, p. 6)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
Small Hydro and Eskom Zimbane Office Fire Protection System
Special conditions
Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time
Contact person
Le-Anne Moses
About this data
- Source
- National Treasury eTenders
- Freshness
- Last checked 27 Nov 2026, 02:37. The official source last confirmed this listing 27 Nov 2026, 02:37. Check the official page for late changes.Last confirmed by eTenders on 27 Nov 2026, 02:37 (SAST). This page was generated on 28 Nov 2026, 10:27 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-178855
- On eTenders
- Open the eTenders tender list and search for E3847GXPOU. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.