Skip to content
ZA NetworkGet started
Public tender · eTendersState-owned companyGautengTender no. E3880DXGOU

The supply, installation, commissioning, maintenance, fleet monitoring and security operations platform of driver camera systems for a period of 1YEAR

ESKOM

Closes

In 44 days

Monday, 11 January 2027 at 11:00 SAST

Add to calendar:Google (closing)Google (briefing)Apple or Outlook

Can you bid?

Confirmed for this tender:

CIDB grade 7 or higher · At least 80% on functionality

Next step

Read the requirements below, then check the official documents before you commit time.

Check against your business, free

Last checked 27 Nov 2026, 02:37. 1 official document. Missing from the listing: estimated value.

In short

What they want
The supply, installation, commissioning, maintenance, fleet monitoring and security operations platform of driver camera systems for a period of 1YEAR
What must be delivered
PAGE 27 C3.1 TSC3 EMPLOYER'S SERVICE INFORMATION 2.6 Invoicing and payment Within one week of receiving a payment certificate from the Service Manager in terms of core clause 51.1, the Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that stated in the Service Manager's payment certificate.From Tender Documents E3880DXGOU.zip, page 29. Read the full scope in the documents.
How much and how long
12 months
Delivery address
1 Dale Road, Midrand, Johannesburg, 1685
Who can bid
CIDB grade 7 or higher
How it's scored
  • You need at least 80% on functionality (quality) before price counts

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Transport and logistics, Security
Briefing session
Optional, 10 Dec 2026, 10:00Microsoft teams
CIDB grading
Grade 7 or higher
Functionality threshold
80%
Type
Tender (request for bid)Published as “Request for Bid(Open-Tender)”
Delivery location
1 Dale Road, Midrand, Johannesburg, 1685
Published
20 Nov 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, PSIRA, Functionality threshold
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
SBD forms (Standard Bidding Documents)
National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
PSIRA (Private Security Industry Regulatory Authority)
Any business that provides security officers or guarding must be registered with PSIRA, and so must each security officer. A security tender asks for the business's registration certificate and usually the officers' grades. PSIRA registration information(opens in a new tab)
Functionality threshold (The minimum quality score)
Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Check it against your business

Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.

No account needed. Your answers stay in this page's link and aren't stored.

Confirmed for this tender

  • CIDB grade 7 or higherRead from official document

    The tender asks for this grading or higher.

    Source: Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf · page 6: “…service or service contract or an order issued in terms of such a contract; or a CIDB grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract.…”

  • At least 80% on functionalityRead from official document

    Bids below the threshold aren't scored on price.

    Source: Tender Documents E3880DXGOU.zip › Technical Evaluation Criteria - Driver Camera and Monitoring Platform.pdf · page 7: “…platform shall automatically refresh without requiring manual intervention. Total 100% Threshold 80% Tenderers who do not meet the threshold of 80% for functionality scoring will be disqualified and not be evaluated further.”

Our assessment

  • PSIRA registrationZA assessment

    We tagged this as security work. If it involves guarding or security officers, PSIRA registration is required by law; the listing doesn't say so itself.

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Where and how to submit

Deliver to the tender box

Must arrive before Monday, 11 January 2027 at 11:00 SAST. Late bids are never accepted.

“…and addenda to the Invitation to tender, 2.5 Any tenders that have not been placed in the tender box or have not been received by Eskom in the manner stipulated in the Tender Data at the closing date and time for tender submission will be considered to have been received late. No late tender will be accepted. Accept that Eskom will not assume any…” (Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf, page 3)

  • Deliver it by hand or courier before the closing time, in a sealed envelope marked with the bid number. Late bids are not accepted.

ZA Network never submits bids for you. The tender documents are the final word on where and how.

Before you submit

Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified

  1. Sign every SBD form

    Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.

  2. Tax compliance status valid on the closing date

    Check it on SARS eFiling before 11 Jan 2027. A status that lapses before closing can cost you the award.

  3. CSD profile compliant, details matching

    Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.

  4. Proof for every point you claim

    Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.

  5. CIDB grade 7 or higher

    Active on the CIDB register on the closing date, or through a joint venture that meets the grade.

  6. PSIRA registration

    For the business and the security officers, current on the closing date.

  7. Reach 80% on functionality

    Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.

  8. The buyer's pricing schedule, complete

    Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.

  9. Every returnable schedule

    List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.

  10. Submit a day early

    Late bids aren't considered, even by a minute. Aim to submit by 10 Jan 2027, and check the address or upload method twice.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 1 of 1 documents, 20 Nov 2026, 16:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 7 or higher

“…service or service contract or an order issued in terms of such a contract; or a CIDB grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract.…” (Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf, page 6)

Functionality threshold

Minimum 80% to be evaluated on price

“…platform shall automatically refresh without requiring manual intervention. Total 100% Threshold 80% Tenderers who do not meet the threshold of 80% for functionality scoring will be disqualified and not be evaluated further.” (Tender Documents E3880DXGOU.zip › Technical Evaluation Criteria - Driver Camera and Monitoring Platform.pdf, page 7)

Subcontracting required

At least 25% of the contract

“…contracts of an estimated minimum project duration of 6 months; and construction works contracts in which at least 25% of the main contract could reasonably be expected to be subcontracted out in one or more of the following CIDB classes of construction works: Civil Engineering (CE) Electrical Engineering Work (EB) (iii) General Building Works (GB) (iv) Mechanical Engineering (ME) 2.31 Eskom may…” (Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf, page 7)

How to submit

In the tender box

“…and addenda to the Invitation to tender, 2.5 Any tenders that have not been placed in the tender box or have not been received by Eskom in the manner stipulated in the Tender Data at the closing date and time for tender submission will be considered to have been received late. No late tender will be accepted. Accept that Eskom will not assume any…” (Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf, page 3)

Contract period

12 months

“…to a contract, or an order issued in terms of a framework agreement that has a duration of 12 months or more, and to: a contract of R5 million or more, in the case of a professional service or service contract or an order issued in terms of…” (Tender Documents E3880DXGOU.zip › Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf, page 6)

Documents the pack mentions
  • CSD registration report (Tender Documents E3880DXGOU.zip › E-tend, p. 2)
  • B-BBEE certificate or sworn affidavit (Tender Documents E3880DXGOU.zip › Eskom_, p. 7)
  • CIDB registration certificate (Tender Documents E3880DXGOU.zip › Eskom_, p. 6)
  • COIDA letter of good standing (Tender Documents E3880DXGOU.zip › OHS Te, p. 2)
  • Proof of briefing attendance (Tender Documents E3880DXGOU.zip › NEC3 T, p. 28)
  • Joint venture or consortium agreement (Tender Documents E3880DXGOU.zip › Financ, p. 1)
Disqualification rules
  • “Failure to FULLY complete the form and submit it to Eskom within prescribe period will render the Tenderer non-responsive and will be disqualified from the Procurement Process” (Tender Documents E3880DXGOU.zip › E-Tend, p. 1)
  • “Tenderers that Eskom finds to be ineligible will be disqualified” (Tender Documents E3880DXGOU.zip › Eskom_, p. 2)
  • “Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified” (Tender Documents E3880DXGOU.zip › Eskom_, p. 2)
  • “If an original tender is not submitted at all, or a copy of the original tender is not submitted at all, the tenderer will be disqualified” (Tender Documents E3880DXGOU.zip › Eskom_, p. 3)
  • “Failure to attend a clarification meeting or site visit that is identified as compulsory will result in disqualification from participation” (Tender Documents E3880DXGOU.zip › Eskom_, p. 4)
  • “the tender will be disqualified” (Tender Documents E3880DXGOU.zip › Eskom_, p. 6)
  • “If the SDL&I Undertaking is not completed and submitted as indicated in the Invitation to Tender, the tender will not be considered for contract award” (Tender Documents E3880DXGOU.zip › Eskom_, p. 7)
  • “A tender that does not contain the mandatory documents or information stipulated in the Invitation to Tender by the required closing date and time for tender submission will be disqualified from further evaluation” (Tender Documents E3880DXGOU.zip › Eskom_, p. 9)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

General guidance

Not part of this listing: what usually applies to South African public tenders.

Need money to deliver this? Tender and contract finance

Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.

Tender and contract financeHow to fund a contractGrants and programmes

If you win: payment terms, and the cash to carry

Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.

Description

From the official listing.

THE SUPPLY, INSTALLATION, COMMISSIONING, MAINTENANCE, FLEET MONITORING AND SECURITY OPERATIONS PLATFORM OF DRIVER CAMERA SYSTEMS FOR A PERIOD OF 1YEAR

Contact person

Masego Tolo

ToloMK@eskom.co.za

011-651-6815

About this data

Source
National Treasury eTenders
Freshness
Last checked 27 Nov 2026, 02:37. The official source last confirmed this listing 27 Nov 2026, 02:37. Check the official page for late changes.Last confirmed by eTenders on 27 Nov 2026, 02:37 (SAST). This page was generated on 28 Nov 2026, 10:31 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-179221
On eTenders
Open the eTenders tender list and search for E3880DXGOU. The official record is also available as raw data.
Missing from the listing
  • Estimated value: eTenders rarely publishes a value. We never estimate one.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

The competition

177 past awards by this buyer.

See who won

Winners, repeat suppliers and their sizes are shown to signed-in accounts. Create a free account to see them.

Similar open tenders

  1. State-owned companyRequest for proposal (RFP)National

    The appointment of a contractor for the design, supply, installation, and maintenance of the intelligent operation center and ai platform for PRASA, as and…

    Passenger Rail Agency of South Africa

    Closes 30 Nov 2026, 12:00

    • IT and software
    • Consulting and advisory
    • Compulsory briefing